FPS Pile Testing Datasheets and other information
To inform the site team what the testing contractor will need to do on site
TargetAudience: Members of the Principal Contractor, main contractor, specialist groundworker working on a piling site
To help ensure that those interpreting the results of a pile test are competent to do so
Target Audience: Testing contractor, piling contractor and the Engineer
To provide a basis for measuring competence of those carrying out pile testing
Target Audience: Testing contractor and piling contractor
To encourage a relevant strategy for pile load testing
Target Audience: Designer of the piles and the specifier of the pile load test
To improve the knowledge of what static, dynamic and rapid load tests can and cannot do
Target Audience: The specifier of the pile load test
To improve the quality of information flow between the piling contractor and the testing contractor
Target Audience: Contract engineers working for the piling contractor
Many pile tests fail structurally rather than due to a geotechnical type failure, and a suitable test cap is essential to help prevent structural problems during testing.
Target Audience: Contract engineers working for the piling contractor
To ensure that the working platform is safe to use throughout the testing activities
Target Audience: Members of the Principal Contractor, main contractor, specialist groundworker working on a piling site
To inform of the minimum standards required for safe pile load testing by a lone worker
Target Audience: Testing contractor, piling contractor and the Principal Contractor
Explains how the Principal Contractor and testing contractor should work together to ensure effective and timely results
Target Audience: Members of the Principal Contractor, main contractor, specialist groundworker working on a piling site
To improve the quality of information flow between the piling contractor and the testing contractor
Target Audience: Contract engineers working for the piling contractor
The Principal Contractor may get frustrated if not all of the tests are positive first time, due to a lack of awareness that the test result may not be an instant pass or fail
Target Audience: Members of the Principal Contractor, main contractor, specialist groundworker working on a piling site
To encourage a consistent description for each stage of evaluating the data
Target Audience: Testing contractor, piling contractor, the Engineer and the Principal Contractor
To encourage a consistent criteria for evaluating the data
Target Audience: Testing contractor, piling contractor and the Engineer
To highlight specific hazards for pile testing
Target Audience: Members of the Principal Contractor, main contractor, specialist groundworker working on a piling site
|