ELECTRONIC BEARING PILE SCHEDULE
Print this page
Some of the biggest potential sources of delay and non-conformance with pile construction are untimely and ambiguous pile design information. The FPS has therefore prepared a simple Excel based spreadsheet to assist both engineers and piling contractors with the provision of pile design schedules.
The Spreadsheet:
- Uses a standardised terminology showing all of the information required to permit construction schedules to be prepared. Colour coding denotes responsibility for completing data cells.
- Allows new revisions to be prepared either from scratch or by copying previous revisions.
- Allows each revision to be saved with a unique file reference.
- Scheduling to be emailed in a standard format to reduce potential delays in retyping pile schedules.
- Allows basic or advanced loadings to be specified.
Electronic bearing pile Excel spreadsheet